This project, delivered for the NSW Department of Education, involves the restoration of the Cessnock High School Hall facilities to full and safe operation following significant damage caused by a major storm event in January. During the storm, uplift occurred to the roof of Block H, resulting in substantial water ingress and consequential damage to the internal building fabric, finishes, and adjoining structures.
The scope of works centres on the full remediation and reinstatement of Block H, the school’s Multi-Purpose Centre, with the objective of returning the facility to a safe, compliant and fully operational state. Internal works include the replacement of damaged timber ceiling systems, reinstatement of the sprung sports flooring system, and the renewal of timber finishes to the stage area to restore both functionality and presentation.
Additional internal and adjacent works comprise the reconstruction of the soffit to the canteen apron, along with the replacement of covered walkways that were significantly impacted during the storm event and subsequently removed as part of initial make-safe measures. Externally, the project includes the reconstruction of the main entrance canopy and replacement of the eastern entry awning, incorporating new covered walkways to ensure safe and weather-protected access between key areas of the school. These works are being under-taken with careful consideration of the existing structures and the operational requirements of a live school environment, ensuring minimal disruption to ongoing school activities.
The final stages of the project involve comprehensive cleaning of all affected surfaces, completion of electrical reinstatement works, and the reinstallation of sports equipment and fittings. Upon completion, the facility will be fully restored to a high standard, providing a safe, functional and resilient environment for staff and students, and ensuring the long-term usability of this important school asset.
Type
RefurbishmentCategory
EducationGovernment
Location
Cessnock, NSWClient
Department of EducationValue
$1m-$5mValues
These values underpin how we go about our daily business and define the Kingston way.
People
We are committed to establishing and investing in long term relationships with clients, staff, communities, suppliers and subcontractors in the absolute belief that this approach creates the greatest value for all.
Planet
We recognise the critical importance of environmental sustainability including water and energy efficiency, pollution reduction, recycling and the implementation of best practice urban design principles to protect the future health and prosperity of the planet.
Performance
We take great pride in constructing quality buildings with exceptionally high standards of finish and client satisfaction. Kingston has received many industry awards for excellence.
Recent Projects
Cyan Waters – Apartment Complex
Cessnock High School – Restoration of Multi-Purpose Hall
Maxwell Recruitment & Training Facility
San Clemente Catholic College – Senior Study & Science Labs
Homes NSW – Medium Density Duplex Program
Civic Theatre Newcastle – Roof Refurbishment
Boolaroo Group Home
St John Vianney Primary School
Blackbutt Nature Reserve Multi-Purpose Centre & Café
Whiteley Group Therapeutic Goods Manufacturing Facility & New Office